Anyone building a new photovoltaic system in Switzerland will sooner or later come across Pronovo. This office handles the most important national subsidy for solar systems: the one-off payment. This guide explains what the Pronovo subsidy covers, how KLEIV, GREIV and HEIV differ, and what to pay attention to when submitting an application.

Important to note: This page is for orientation purposes only and does not replace subsidy or legal advice. Your specialist installer supports you with planning and the application. Your entitlement to funding is determined by Pronovo’s decision.

Pronovo subsidy for photovoltaics: the one-off payment in Switzerland explained

Key points at a glance

The key points of this section can be summarised briefly:

  • The one-off payment (EIV) is a single investment contribution, not an ongoing tariff. It is paid out after commissioning.
  • There are three programmes: KLEIV for small systems, GREIV for large systems, and HEIV for systems without self-consumption.
  • KLEIV and GREIV amount to a maximum of around 30 percent of the investment costs of reference systems.
  • The application is submitted via the Pronovo customer portal, usually after commissioning. The specialist installer often handles this.
  • Cantonal and municipal subsidy programmes can often be used additionally.

Pronovo reduces investment costs, but the amount and process depend on system size, timing and current subsidy rates.

  • As of 04.11.2026
  • Sources at the end of the article

What role does Pronovo play?

Pronovo is the federal accredited enforcement and certification body for the promotion of renewable energies. For new photovoltaic systems, the one-off payment is the most important funding instrument. Systems without self-consumption from 150 kW can instead receive a sliding market premium through an auction. The former cost-covering feed-in remuneration is no longer available for new systems. Pronovo reviews applications, issues funding commitments, and processes payments. In addition, Pronovo operates the certificate of origin system, which documents the ecological value of solar electricity.

What is the one-off payment?

The one-off payment is a single subsidy towards the investment costs. Since 01.04.2024, for new systems it consists only of a capacity-based contribution per kW; there is no longer a basic contribution. For systems commissioned from 01.04.2025, it amounts, below 30 kW, to CHF 360 per kW for attached or free-standing systems and CHF 400 per kW for integrated systems (Energy Promotion Ordinance, as of 01.07.2026). The amount of the remuneration depends on the commissioning date, the system's capacity in kilowatt-peak, and the type of system – that is, whether the modules are attached to the building, free-standing, or integrated into the building.

The ordinary capacity-based contribution depends on the installed output, not on the amount of electricity fed into the grid. Yield-based bonuses such as the winter electricity bonus require additional proof. The contribution is paid after commissioning and inspection of the system.

What do KLEIV, GREIV and HEIV mean?

The three programmes differ mainly in terms of system size and whether the system has self-consumption:

ProgrammeFor which systemsIn brief
KLEIV – small one-off paymentSystems under 100 kWThe typical subsidy for single-family homes and smaller apartment buildings. Together with GREIV, up to around 30 % of the investment costs of reference systems.
GREIV – large one-off paymentSystems of 100 kW or moreFor larger roofs, commercial properties, and sites. The contribution is calculated using the applicable capacity rates and any bonuses, also with an upper limit of 30 % of the costs of reference systems.
HEIV – high one-off paymentSystems without self-consumption: from 2 to under 150 kW without an auction, from 150 kW by auctionFor systems that feed their entire production into the grid. The contribution can be higher (up to around 60 % of the costs of reference systems). From 150 kW, HEIV and the floating market premium are awarded through auctions.

In addition, there are various bonuses, for example for highly inclined or facade-integrated system components as well as for certain systems with high winter electricity yield. These bonuses are linked to specific technical requirements and commissioning dates and are granted in addition to the capacity-based contribution. Pronovo continuously publishes the respective applicable rates and requirements – it is worth checking the current values before any planning.

Planning a system of 100 kW or more, for example on a commercial or barn roof? Find out how to apply for the large one-off payment before construction and which rates apply in 2026 in One-off payment for large photovoltaic systems (GREIV).

How is the one-off payment calculated?

You multiply your system's output in kW by the rate per kW that applies on the day of commissioning. For an attached 10 kW system commissioned from 01.04.2025, that is 10 × CHF 360, i.e. CHF 3’600. There is no basic contribution on top: it was abolished for new systems on 01.04.2024.

For larger systems, the output is split into tiers. Each tier has its own rate, and at the end you add up the partial amounts. Here is how to do it:

  1. Determine the system type: Attached means the modules sit on the roof or on the façade. Free-standing means they stand on their own frame, for example in the garden. Integrated means the modules replace part of the building envelope, such as the tiles or the façade cladding, and also take over its function, for example weather protection. Modules that are merely mounted flush do not qualify.
  2. Calculate the first 30 kW: CHF 360 per kW for attached or free-standing systems, CHF 400 per kW for integrated systems.
  3. Calculate the part from 30 to under 100 kW: CHF 300 per kW attached or free-standing, CHF 330 per kW integrated.
  4. Calculate the part from 100 kW: CHF 250 per kW, the same for all system types.
  5. Add up the partial amounts: The result is the output-based contribution, the core of your one-off remuneration.

The table shows typical sizes from a detached house to a commercial roof, calculated for systems with self-consumption commissioned from 01.04.2025:

OutputAttached or freestandingIntegrated
5 kW5 × 360 = CHF 1’8005 × 400 = CHF 2’000
10 kW10 × 360 = CHF 3’60010 × 400 = CHF 4’000
20 kW20 × 360 = CHF 7’20020 × 400 = CHF 8’000
50 kW30 × 360 + 20 × 300 = CHF 16’80030 × 400 + 20 × 330 = CHF 18’600
100 kW30 × 360 + 70 × 300 = CHF 31’80030 × 400 + 70 × 330 = CHF 35’100

Source: Energy Promotion Ordinance (EnFV), Annex 2.1 items 2.5, 2.8 and 2.9, as of 01.07.2026; own calculation

The tier from 100 kW only applies to each kW above this threshold. An attached 150 kW system therefore receives CHF 31’800 for the first 100 kW and 50 × CHF 250 for the rest, CHF 44’300 in total. From 100 kW, the large one-off remuneration is usually an option. You can submit the application for it before construction. Read what to bear in mind under One-off payment for large photovoltaic systems (GREIV).

When is a bonus added?

If some of the modules are steep, with a tilt of at least 75 degrees as on a façade, a bonus increases the contribution for exactly that part. It amounts to CHF 200 per kW for attached or free-standing modules and CHF 400 per kW for integrated ones. An attached 10 kW façade system thus comes to CHF 3’600 plus CHF 2’000, CHF 5’600 in total. The bonus for systems with a high winter yield has its own rules and evidence requirements; it cannot simply be added to the tilt bonus.

If your system feeds all its electricity into the grid, a different calculation applies. For systems from 2 to under 150 kW without self-consumption, the base rate of the high one-off remuneration is CHF 450 per kW. In return, you forgo self-consumption for 20 years. Additional conditions apply to possible bonuses.

How do you check the amount in your quote?

Pronovo offers its own tariff calculator on its website. You enter the output, the planned commissioning date and the system type and see the subsidy amount, including the bonus for steep modules. The result is non-binding, but it is a good way to check the figure in a quote.

Keep two points in mind. What counts is the rate on the day of commissioning, not on the day of the quote. And the one-off remuneration is a deduction from your costs that is only paid out after commissioning. Good quotes therefore show the price before and after subsidies separately. When you Compare quotes, you can quickly see whether all specialist installers are using the same rates. How subsidies affect the total price is shown in the guide What does a photovoltaic system cost?

Who can apply for a subsidy?

An application for a one-off payment can in principle be submitted by any operator of a photovoltaic system. The system must have a certain minimum output and a fixed location. For owner-occupied homes and smaller apartment buildings, KLEIV is usually applicable.

Eligible applicants can submit the application themselves or authorise a third party – often the specialist installer carrying out the installation.

Which documents are required?

The specific requirements vary depending on the programme. You need certified system data and the required electrical documents, for example the acceptance protocol or the safety certificate with the measurement and testing protocol. In addition, you need proof relating to the property, the owners’ consent where necessary, and payment details. For integrated systems, photos taken during and after construction are also required.

The Pronovo customer portal shows which documents are required in your case while you fill in the application. The specialist installer knows the process and can submit it for you.

When should the application be submitted?

For KLEIV, the application is submitted after commissioning. For larger systems, an application can sometimes be filed before commissioning. Due to high demand, there may be waiting times between the application and payment; an application is processed once the documents are complete. It is worth checking the process and current waiting times with Pronovo early on.

How can Pronovo and local subsidies be combined?

The national one-off payment can often be combined with programs from the canton, municipality, or energy supplier. These regional programs vary greatly – some subsidize the solar system, others storage, charging infrastructure, or the overall renovation. For cantonal and municipal contributions, applications often need to be submitted before construction begins. Check additional programmes with your canton and municipality.

You can read how subsidies affect total costs on the page What does a solar system for a single-family home cost. An overview of further funding opportunities can be found under Subsidies for photovoltaic systems in Switzerland.

Who subsidises what?

The following overview compares the most important influencing factors:

LevelTypical subsidyNote
ConfederationOne-off payment via Pronovo (KLEIV, GREIV, HEIV)National investment contribution
CantonAdditional contributions, some for storage or renovationVaries significantly, sometimes application required before construction begins
MunicipalityLocal subsidy programmesNot available everywhere
Energy supplierOwn programmes, payment for guarantees of originDepending on the grid area

For a reliable assessment, always consider these points together with the location, consumption and a specific quote.

What should be checked before the quote?

Before the quote, you should above all clarify the subsidy questions that affect the process and cost-effectiveness:

Point to checkWhy it matters
Which EIV category applies?Determines the process and approximate contribution amount
Current rates and bonuses at PronovoValues are adjusted regularly
Cantonal/municipal programmesIn some cases, an application is required before construction begins
Who submits the application?Often handled by the specialist installer
Tax treatmentVaries by canton

This makes it quicker to see whether a quote is complete, comparable and plausibly structured.

What mistakes are frequently made regarding subsidies?

The key influencing factors can be summarised in a few points:

  • The subsidy is forgotten or incorrectly included in the payback calculation.
  • Cantonal and municipal applications are submitted too late.
  • Outdated rates are used, even though Pronovo adjusts the values.
  • The timing of the application is not coordinated with the specialist installer.

For a reliable assessment, always consider these points together with the location, consumption and a specific quote.

Why do specialist installers help with planning?

An experienced specialist installer knows the current subsidy models, the appropriate category for your system and the application process. They can include relevant subsidy options in the planning and often take over the application submission. This reduces effort and the risk of errors.

solar-guide.ch recommends: Check the currently valid rates and bonuses directly with Pronovo, as these are adjusted regularly – do not rely on outdated values. Also clarify early on whether cantonal or municipal applications must be submitted before construction begins. This often cannot be corrected afterwards.

Conclusion

The Pronovo subsidy is the central national component for reducing the investment in a photovoltaic system. Which category applies, how high the contribution will be and which regional programmes come on top depend on the specific project. The easiest way to clarify this is together with a specialist installer.

Subsidies have a significant influence on the cost-effectiveness of a photovoltaic system. Suitable specialist installers can take relevant subsidy options into account during planning. Via solar-guide.ch, you can have your request forwarded free of charge and without obligation to up to three suitable specialist installers.

Request non-binding quotes

Frequently asked questions and answers

What is the Pronovo subsidy?

This is the one-off payment – a one-time investment contribution for photovoltaic systems, processed through Pronovo and paid out after commissioning.

What is the difference between KLEIV, GREIV and HEIV?

For new systems, the basic rule is: KLEIV under 100 kW, GREIV from 100 kW, HEIV for systems without self-consumption. KLEIV and GREIV amount to at most 30 percent of the investment costs of reference systems; HEIV can be higher.

Who applies for the subsidy?

The operator of the system is eligible to apply. In many cases, the specialist installer submits the application on their behalf.

Can I combine Pronovo with cantonal subsidies?

In many cases, yes. Cantonal and municipal programmes are designed differently; in some cases, applications must be submitted before construction begins. Check the regional programmes early on.

How long does the payout take?

That depends on current demand. For processing and payment, all details and documents must be complete; there may be waiting times. You can find current information from Pronovo.

How much one-off remuneration do you receive for a 10 kW system?

If the system is commissioned from 01.04.2025 and has self-consumption, you receive CHF 3’600 for an attached or free-standing system and CHF 4’000 for an integrated system. If modules are tilted at least 75 degrees, for example on a façade, a bonus is added for that part.

Is the Pronovo tariff calculator binding?

No. Pronovo itself describes the result as non-binding. What counts is Pronovo's decision after the application has been reviewed with all documents.

How helpful is this article?

Average: 5 out of 5 stars (2 ratings)

Solar news by email

News on photovoltaics, subsidies and renewable energy from solar-guide.ch. You can unsubscribe at any time.

Sources

3 sources
  1. Federal Council: Energy Promotion Ordinance (EnFV, SR 730.03), Art. 6, 38 and 41–43 and Annex 2.1 items 2.5 and 2.7–2.10, as of 01.07.2026
  2. Pronovo: Richtlinie Photovoltaik 2026, version 4.2, October 2026 (integration, bonus rules, high one-off remuneration, application procedure)
  3. Pronovo: tariff calculator for photovoltaics, one-off remuneration, accessed 04.11.2026